RevitBIM coordinates systems for a range of projects — from residential buildings and basements to parking facilities, hospitals and clean rooms. A BIM-based process enables 3D review of building systems, helps identify clashes and supports solution development together with the consultants.

Discuss systems coordination

01 / TIMING

When should coordination begin?

Systems coordination is generally suited to a relatively advanced design stage, once the brief and design have taken shape and consultants have drawings or models with the required information. For some projects, coordination may begin before tender; for others, during detailed design. The right timing depends on the project's status and the information available.

02 / COORDINATION WORKFLOW

The coordination workflow

01

Information gathering and initial review

Collect current information from all consultants, including 2D drawings and existing 3D models. The initial review covers architectural and structural design, with site development included in the overall coordination picture.

02

MEP systems coordination

Coordination continues with HVAC, electrical and plumbing systems. Component locations and routes are reviewed, including complex areas such as HVAC ducts and gravity drainage. Solutions are developed together with the consultants. BIM methods can also be used when a project is not fully model-based.

03

Clash review and solution development

Systems are reviewed in 3D to identify clashes and points that require a decision. The appropriate solution is discussed and advanced with the relevant consultants.

04

Consultant comments and cloud tracking

Review findings are documented in an organized issue list with references to the required changes. Information is managed in Autodesk's cloud environment so items can be tracked and shared with consultants for updates. Complex issues can be discussed in working meetings.

05

Opening plans and coordination closeout

After systems coordination, penetrations through structural elements are reviewed. The opening plan records dimensions, locations and opening numbers and is sent to the structural engineer for approval, supporting preparation for the next stages and construction.

03 / SCOPE

What does the service cover?

  • Coordination of architecture, structure and site development
  • HVAC, electrical and plumbing coordination
  • 3D reviews and clash identification
  • Organized issue lists and tracking in Autodesk's cloud environment
  • Opening plans prepared for structural-engineer approval

04 / COLLABORATION

Coordination is a collaborative process

Effective systems coordination combines engineering review, collaboration with consultants and clear documentation of decisions. The aim is to identify problematic areas, advance solutions and give the project team organized information for the next steps.

05 / NEXT STEPS

How to get started

  1. 01Share the current project stage and intended schedule.
  2. 02Provide the available consultant drawings and models.
  3. 03Review the available information and required coordination scope.
  4. 04Agree on the workflow for comments, information sharing and update tracking.
Explore projects

Have a project that needs systems coordination?

Tell us about the project stage, participating disciplines and information already available. We can review a suitable way to proceed together.